A longer power cut needs a different plan from a brief interruption. Long backup UPS system price in Sri Lanka depends on the essential load and required runtime, together with a compatible UPS, battery string and charger. Battery capacity alone cannot establish the complete system cost.
Equipment prices checked: 30 October 2026. This is a planning guide. Final quantities, compatibility, availability and technical charges need confirmation.
State the load and runtime together
List the equipment that must stay on and its measured or documented power draw. Separate essential loads from devices that can shut down. Ask for runtime evidence for the proposed UPS and battery arrangement at that load. A kVA rating identifies capacity; it does not by itself promise a specific number of backup hours.
Match the battery bank to the UPS
Confirm the permitted DC string voltage, number of batteries, charger capability and supported battery type for the exact UPS model. Do not infer compatibility from a shared 12V label. The quotation should identify every battery, interconnect, enclosure and protection component required by the approved design.
Allow for commissioning and later renewal
Installation includes more than placing batteries beside the UPS. Scope the electrical connections, enclosure location, ventilation and commissioning checks. Record the installed arrangement and maintenance expectations. Battery condition changes over time, so future renewal is part of ownership cost rather than an unexpected accessory purchase.
Long Backup UPS System price in Sri Lanka: catalogue examples
These are individual equipment examples, not a tested bundle or an installed package price. Prices are in Sri Lankan rupees (LKR). Options and additional quantities can change the total.
| Listed equipment | Listed price (LKR) | Availability at check |
|---|---|---|
| Kstar (China) 2Kva Online Ups Single Phase (Long Backup) (2Y) | 165,000 | Listed in stock |
| Amaron (India) Quanta SMF-VRLA Battery 12V 65AH (2Y) | 65,000 | Listed in stock |
Product warranty follows the individual listing and confirmed offer. Installation and workmanship terms are stated separately. Follow the product links for the latest price and availability; a listing does not reserve stock.

Compare a complete quotation
Ask the proposal to separate equipment, accessories, delivery, technical work and optional ongoing support. Check quantities and the supplied package before comparing totals. Site access, existing infrastructure and the agreed testing can change the installation charge. No installation price is included in the equipment examples above.
What to send for an accurate estimate
- UPS model and existing battery arrangement
- Essential equipment and actual load
- Required runtime at that load
- Available space and electrical connection details
Include your exact site address and town or suburb, photos where useful, and the result you need. Tell us about existing equipment you want to retain so the proposal can identify what needs checking.
Frequently asked questions
Does the displayed UPS price include the external battery bank?
Do not assume it does. Ask the quotation to state the included battery quantity and any external batteries, cabinets or installation charged separately.
Can I calculate runtime from Ah alone?
An Ah figure is insufficient. Runtime also depends on string voltage, load, discharge characteristics, system losses and the manufacturer’s supported arrangement.
Where are site visits available?
Richcom provides site visits only in Colombo and suburbs. Your address, preferred appointment and any visit or inspection charges need confirmation before a visit is arranged.
Discuss your project with Richcom
For Long Backup UPS System price in Sri Lanka, use the equipment examples to prepare your requirements, then request a proposal for the actual scope. Our team can review equipment supply and separately quoted technical work.
Site visits: Colombo and suburbs only. Appointments require confirmation. Any site-visit, inspection, installation and equipment charges are confirmed separately.

